Work Begins on the Interior Supports - Stairs and Window Frames

January 14, 2011 - This week we just about finished cutting out all of the common walls (only one more wall to go)!  With the common walls removed, we needed to add 2" x 2" x 1/8" steel columns to support the floors and ceilings.  It is amazing how "bouncy" the center of the floors between the containers are when the walls are removed. We had been using Triple S Steel for our red iron, but decided to look around and found another source (on Craigslist) that saved…

Read More

Cutting the Boxes and Installing the Windows

January 20, 2011 - The weather turned cold this week (for Houston anyway) with morning temperatures dipping down in the low 20's. The rain didn't help matters. We used window tape to seal the tops of the containers, and used the same tape inside to seal the openings between containers. We bought some small propane heaters that are used atop 20 pound propane bottles and that made things a little warmer. We turned containers 9&10 into a workshop which helped to keep things organized. …

Read More

Interior Work on the epic Creative Co-Op - Removing the Common Walls

January 2, 2011 - With the containers set in place, we turned our attention to working on the interiors - specifically, removing the common walls. Our building design includes the removal of 8 common walls, for a total of over 480 linear feet of steel to be cut.  The walls of the container are very heavy, and we cut them into 3' wide by 9' tall sections, for another 720 feet of cutting.  We really put our Hobart plasma cutter to the test.  With 80% of the walls removed at the…

Read More

The Crane Arrives and We Set All 11 Containers in Just Under 5 Hours!

December 21, 2010 - Today was the big day and it went off picture perfect.  For months we have been concerned about getting the containers positioned on the foundation, and on top of each other as we had designed.  If you have been following this blog, you know we went through over 50 designs before arriving at the one we felt allowed "form to follow function", at an estimated price we could live with.  Building it in Sketchup was difficult, so how much more difficult would…

Read More

Pre-Crane Prep Work - Removing Doors, Building Trusses and Cleaning the Containers

December 13, 2010 - With the plumbing in and the foundation curing, we turned our attention to getting the containers ready for placement.  We had just 6 days to locate an 11th container, get it shipped up to our property, get all the units cleaned, prepped and build 6 trusses cut to a tolerance of less than 1/8".  So the work covered in this blog entry took place over six days starting with the hiring of Adam Falcon as the lead Welder for the project.  Adam was recommended by…

Read More