Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

ADA Ramp Work Continues - Black Cellulose Added to the Big Room - Dirt Delivered and Leveled

July 11, 2011 - With afternoon temperatures up around 100 degrees each day (that is 10 degrees above normal for this time of year), and no rain in the forecast, we were still able to make some great progress both inside and outside the building this week. We added an additional 115 feet of steel to the ADA ramp, and by the end of the week had reached the second floor. Since the ramp is on the west side of the building, we tried to get most of the work done in the morning, but once the guys get going they don't want to stop.

We got 8 more loads of fill dirt which was needed for some low spots in the front. The dirt had lots of organic material in it (sod) which we removed by hand and planted around the sides of the building. This left clean fill dirt which is just what we need for under the concrete walkways. We had Alfredo Gusman from Goosestone Construction come out to knock down the pile and begin the excavation work on the drive way, and entry ramp.

We also had Jeremy Crow from Crow Construction come out to take out the concrete curb where the new driveway will go. This took about four hours to do because of the re bar and density of the concrete used for the curbs. Next week Jeremy will come back with his crew and install the wooden forms for the walks. With the forms in place, we are hoping to pour concrete on Tuesday or Wednesday. This will be a big job and we have to get it right. We need to make sure everything meets ADA code, and follows good building practice - you don't wan to make mistakes when concrete is involved.

This week we also made a trip down to see Vic Tamborella, the owner of VT2 Studios, one of the largest video production firms in the city, and now out of business. VT2 had an amazing facility with a set of gigantic light grids. The bank has taken over the building that VT2 occupied, and Vic had just 2 days to get any of his personal possessions out of the building. The grid was in excellent shape, but it was overkill for our needs. The trip was worth it because we did get some ideas for our studio, and Vic gave us some fire extinguishers that we will need for the building inspection.

The crew from ComforTemp also returned this week to blow black cellulose onto the ceiling of the video production studio. Unlike the cellulose in the walls, this product is dyed black and includes a glue so it can be blown into place without the need of netting or wallboard to keep it there. It will further insulate the room, but more importantly, it will greatly help the quality of the sound by reducing the natural echo you get in a room like this one.

ComforTemp also added black cellulose to an interior edit suite and the sound booth in the Silver Rock space. Next week they will return to add 12 inches of cellulose to the attic space, and we can check insulation off the list. Insulation was one of the things we worried about most at the outset of the project, but we have to thank Paul Adomoli of ComforTemp for the wonderful job he and his crew did for us.

When it really got too hot to work outside, the guys turned their attention to building out the counter-tops in the Silver Rock Kitchen and in units 9 & 10. We also have a plan for the floors in units 1,2,3 and 4, that will allow us to use the Italian ceramic tile we picked up from a builder who went out of business.

Next week we will continue to work on the ADA ramp, and try to get all of the flat work (concrete walks and driveway) done.

 




Posted by on June 10, 2011


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



ADA ramp installation - when the ramp changes direction a 5 foot x 5 foot landing is required.

All the cross members on the first section of the ramp were welded in place.

The guys weld in the ramp landing on the 2nd floor. A sledgehammer often helps to get the job done.

Long view showing the ramp in place.

The wooden frame for the kitchen counter was built this week.

VT2 Studio lighting grid (1 of 2) in the raised position.

Electrical unit that controls the wenches that raise and lower the grid.

6 motors are used to lower and raise the grid.

The grid was dismantled and removed from the building later this day.

SGPS built the grid.

VT2 also had some other items for sale like this clear podium.

Jeremy of Crow's Construction breaks the concrete curb for our new driveway.

A rented hammer drill was used to further break up the concrete.

ComforTemp begins to blow on the black insulation to the ceiling and the top 3 feet of the wall.

ComforTemp worker takes a break from installing the cellulose in the big room.

The black cellulose contains glue which sticks to everything.

Workers remove the plastic sheeting used to protect the walls and floor during installation.

The room is now ready to be painted and work to begin on the cyc wall.

 
 
spacer