Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Trenching the Water, Sewer and Electrical Lines

March 27, 2011 - We tackled a couple of major jobs this past week including the trenching work on the water, sewer and electrical lines to the building. We started trenching by hand, but David Cox (our Construction Manager) had me add up the cost for the 4 guys digging the trench and it quickly became obvious we had to find a less expensive (and easier) way to do this. The world is just too big to move dirt one shovel full at a time.  Since we had over 250 feet to trench, it was time to bring in a piece of equipment better suited for this type of work.

A quick call to a friend at Sunbelt Rentals got us a mini-excavator (with the trailer) for $195 for a 24 hour period. When we arrived at their yard we were told we had the wrong size bumper and ball hitch on our truck.  We needed to get a 2-5/16 inch ball to haul the large construction trailer at Sunbelt. We used Mike Huffine's Suburban which had the 5000 pound load capacity receiver hitch needed to haul the trailer. We began trenching at about 2:00pm, and decided to work until dark. By 7:00pm, we had all the lines dug, and Alan began running the 4 inch PVC schedule 40 pipe. The pipe has to go into the ditch as a specific slope and in a special way as we found out when the MUD Inspector came by to check out our work.

Turns out the slope of the sewer line must be between 2 and 4%, and our line was right at 4%. There were also some "bellies" or low spots in the line that the inspector pointed out.  These low spots are natural places for grease to accumulate which can lead to a sewer line back up. Since the line had not been burried, changing the slope was just a matter of adding some dirt back into the ditch.

The excavator also came in handy for digging the trenches for the power lines to the building.  We will be running 3 individual aluminum lines in 1 inch electrical PVC conduit.  We built and set up a the mounting board for the meter cans, and trenched a ditch to the main utility pole that brings power to the building. Inside the building, we drilled a hole in the concrete in the mechanical room to receive the 8' long copper ground rod we will add in the next week or two.

For those not familiar with the term "Freecycling" it is a beautiful newly coined word for anyone looking to get something done on a tight budget.  If you have an item you no longer want or need, you can sell, it or just give it away to someone who can really use it.  The idea is to find a new home for the item so it does not end up in a landfill, but instead, goes on to give continued use to a new person.  A few weeks ago I saw this beautiful kitchen set in a warehouse and asked about it.  I was told it had come out of a house in Florida, and might be for sale.  We talked to the owner - James Larimore - who had visited our building a couple of times. He said "I am not planning to use it - why don't you just take the cabinets for your project?"  Then James said - "come by the warehouse and I will even help you load them in your truck".

Wow! - thousands of dollars worth of cabinets for free.  Freecycling is my new favorite word. There are even sites devoted to freecycling, so check them out before you go and buy something you might be able to get for free.  Or, post some of the things that are too good to throw out, but you know you are never going to sell to a freecycle web site.  You can be sure James will be getting an invitation to our open house party...

 




Posted by on March 28, 2011


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



After getting all of the interior pluming lines in, we started trenching the outside lines.

We rented a mini-excavator from Sunbelt Rental.

AJ trenches around the phone lines.  We ended up cutting them by accident later in the day.

Cole ran the trencher. We went down 4 feet.

It took about 3 hours to dig the 140' trench and lay the pipe.

Alan primes the 4 inch sewer line before he add the solvent cement to make up the joint.

Here you can see where the sewer line ties into our lift station.

The Inspector from the MUD district stopped by and made some suggestions which we did. He will return next week to make sure they were done as requested.

The Falcon men - Adam, Brian and Mr. (John) Falcon, PE.

We had to dig down more then 7 feet to get to the 3 inch fresh water line. The blue line above it is our fiber optic line.

We also ran a 1 inch electrical conduit in the trench for the Cat 5 wire to the switch in our building.

Close up showing the Cat 5 conduit line where it will enter the building. White Bull Tape will be used to pull the wire through the line.

We used the mini-excavator to dig out the electrical conduit buried several months ago.

The meter cans will go on this 4 inch by 4 inch wood frame.

Keith and Snake buffed out all the rust on the 2nd floor containers.

A donation of kitchen cabinets from James Larimore - from his kitchen in Florida.

These sinks and fixtures were purchased from Woodlands Online along with 4 cabinets for $325 - that is a super deal.

We removed the doors on container #9 and added a wall for a 36 inch door.

We have some repair work to do in the containers before blowing in the insulation.

 
 