Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Interior Plumbing, Electrical, Sheetrock and Siding Work Begins

March 4, 2011 - We just had a great week and in this blog entry we will provide some details about the interior plumbing, electrical, sheet rock, and exterior siding work that was done.  With some jobs - like electrical for example - a lot of work goes into it, but the actual job site does not change much.  With others - like welding, sheet rock, and siding, when new work is done you can really see a difference in the way the building looks.  Even though they are hidden behind the walls, things like plumbing and electrical work are on the critical path to getting the job done.

We made a trip to U.S. Fence early in the week and purchased just under $2,000 in structural steel and metal.  This material was used to fabricate the large, second floor 44' wrap around balcony on the North side of the building. That balcony continues around to the west side of the building and becomes the walk that connects the units on the second floor. It will become the ADA ramp that allows wheelchair access to the upper units.

First the metal framing for the decks, walkways and balconies were cut to size and welded together. Next, fabrication work was done on the hand rails which included drilling holes for the wire rope that will be used below the rails. 

We asked for a visit from our ADA Engineer - George Harris - who checked out our work, and let us know what things needed to be corrected before we got too far into the construction process.  For example - I had some very nice 32" French doors that were replaced after Hurricane Ike.  Beside some small areas of rot at the bottom (easy to repair), the doors were in good shape.  When both doors are open, the opening is over 60" wide. According to ADA specifications,  a person in a wheelchair needs to be able to open both doors at once with a pull of less than 5 pounds. These doors were rejected Since we had 3 sets of doors we were planning to use, and now cannot, we will need to spend over $1500 to meet this requirement.  Don't get me started...!

We started running the EMT electrical conduit and pulling wires through the steel pipe to all parts of the unit (you can't use Romex Wire on a commercial structure).  By qutting time tonight, we had most of the interior electrical work done. It was the same story with the plumbing.  At the beginning of the week, we just had the stub out lines that were placed in the slab months ago, and by Sunday night, just about all of the interior plumbing will be in place. Next week we will rent a mini-excavator and dig the trench needed for the sewer line, and water line.  We will also use the excavator to dig the trench for the electrical power lines that will go from the utility pole to our meters, then into the panel boxes inside the building.

With most of the work on the interior framing in place, the Silver Rock guys came in on Sunday and ran all of their data and voice cable.  With the cable in place, we were able to begin the sheet rock work on the interior walls.  We got several rooms done, or at least started and should finish those rooms next week.  Silver Rock will be in this weekend as well to drop their cable in the trenches we will dig next week to tie into our fiber optic switch.

We awarded the work for the siding, roofing, and other exterior trim to the framing contractor who installed our roof trusses. It will take them 6 days to do this work, and they got a good part of it done over the past two days.  We had a salesman from Triple S Steel visit the site today and he will give us a bid on the R-Panel needed for the roof.  The walls will be covered with ACM (Aluminum Composite Materials) from Diassa (AluDiassa brand) and Mitsubishi (Apolic brand) for the big room wall and trim.

With so many things going on, the support provided by David Cox of Pinnacle Residential has been and continues to be priceless.  David knows how to work with subs, suppliers, and his 30 years of experience has made me move forward with confidence.

We have been receiving a number of emails asking for site visits, but at this time, it is dangerous out there, and have asked people interested in visiting the project to sit tight for now.  Our plans are to have a formal workshop at the end of the job.  We will offer a tour, lunch and a beer, followed by a step by step slide show of the construction process.  If you are interested, send me an email (.(JavaScript must be enabled to view this email address)) and we'll put you on the mailing list.

 




Posted by on March 04, 2011


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



Work begins on the west side walkway and ADA ramp.

Closeup showing the balcony landing for the ramp.

2 inch tubing was used to temporarily support the ramp.

View of the ramp looking south.

Mike and Adam Set the rails for the 44 foot wrap around deck.

Mike checks to make sure the rail height is correct.

The rails for the deck are welded in place.

Adam checks to insure the deck column is plumb while Mike welds it in place.

Time out for a picture.

The Silver Rock guys run their CAT 6 wire for their voice and data lines.

Prices for the wire were much better at Frys vs. Home Depot.

All the Silver Rock Cables terminate in their server room.

This portable wire cart allows Tony to easily move around the job site to pull wire.

Chad and Keith set the first interior sheets of wall board. Over 30 sheets were hung by the end of the week.

The containers were designed to leave an area that will be turned into a utility room. A hole was cut in the container for the sewer line on the second floor.

All piping comes into and leaves the building through this room.

We uncovered the sewer line for the building, and next week will tie it into the main sewer line.

Danny our framer and his crew are back to put up the siding, fascia, sofit, and R-Panel roofing.

Extra strapping was added to the building to keep the roof on during a hurricane.

Barge rafters were added to ends of the trusses, then covered with Harti-plank.

 
 