Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Getting the epic Creative Co-Op ready for Leasing

November 13, 2011 - We are making great progress on checking off the items on our punch list, and this week we worked on organizing the building. Now that we have a concrete floor under the ramp, we were able to move the Silver Rock utility trailer out of the studio and into this secure area. We also cleaned up in and around the building, getting our tools and materials organized. It is important from time to time, to stop and organize the site. Soon, we will start to formally show the building and look to lease out the remaining spaces.

We continued work on the summer kitchen, and got the plumbing installed and working. We added concrete pavers in front and to one side of the counter, and painted both the inside and outside of walls.  Next week, we will add a footrest (a 2" OD steel pipe) to the front wall of the summer kitchen, and finish trimming it out.

I visited Southwest Building Products and picked up a small sample of FuzeGlass counter top material. This product is really amazing. It is lighter than I expected, and the imbedded glass really bring the surface to life. Next week we will detail the installation of this low carbon cement and recycled glass product.

We continued to add trim to those parts of the building that need it - mainly around some doors and eve areas. With some luck, we will have the building completely trimmed out by the end of next week.

We have a pile of scrap iron from the job, and I called over to several recycling yards around town to see what it is worth. It seems like $0.11/pound is the going rate, and we have about 2 pick-up loads that we will haul off at the end of the job.

Although we have not advertised the building for rent, we have had a number of folks interested in leasing it. Most are friends, or people who have just passed the building, and stopped in to take a look. I don't think we will have any trouble leasing the units, but we are looking to rent the spaces available to other creative companies allied to our core business. In some cases, these businesses may overlap our work, but that is OK. We are looking to build a "one stop shop" for clients that need all kinds of production services.




Posted by on November 14, 2011


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



Top view of the summer kitchen and picnic table area.

The concrete deck continues to cure.

The sink was set and then the plumbing added.

The plumbing was completed under he outdoor kitchen sink.

The sink now works - we will add the trim next week.

We added some pavers in front of the summer kitchen.

A course of pavers was also added around the side of the summer kitchen.

Closeup photo of the Fuezglass material

Side view of the Fuezlass countertop sample,

Here you can see where door trim is needed...

...and here is how it looks after the ACM trim was added.

Trim is needed to hide the insulation foam between the containers.

Some of the trim remaining includes the exterior door to the deck.

Utility trailer finds a home under the ramp.

Scrap iron remaining from the building.

 
 