Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Foundation Prep and Dirt Work Begin on the epic Creative Co-Op

November 24, 2010 - Over the past few days, Mr. Brooks completed most of the dirt work on the pad site with the help of his Ford (New Holland) 60hp tractor with 8' box blade.  The tractor is 11 years old, but you would not know it by looking a it.  He also has a ten year old Bob-Cat Skid loader with tracks that look new as well.  "No one but me uses any of my equipment" he said "and that's why they look like they do".

The north part of the pad where the building will go is about 3 feet higher than the south side.  This required quite a bit of dirt to be moved around.  He began his work by removing all of the topsoil and roots that remained from the initial removal of over 28 trees and lots of underbrush. Luckily, the dirt below the topsoil was good, and it would not require us to bring in any select fill. It also meant we would not have to truck any dirt to the back of the property. This will save us some time and money in the next phase of the project - setting the piers and forming up the foundation walls.

Over the weekend a truck arrived with a load of lumber, steel re bar, and other materials that would be needed for the foundation.  Sebastian and his helper built a pair of workhorses, and began the job of cutting the re bar to length, and assembling the 29 reinforcing columns that will be centered in each of the holes that will be drilled next week.  At quitting time on Wednesday, they had assembled 18 of the piles.  They also placed the 29 flags where the holes would be drilled.




Posted by on November 28, 2010


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



Sebastian, David and Mr. Brooks discuss the placement of the building on the pad.

Mr. Brooks and his 11 year old New Holland (Ford) tractor

A number of passes were needed to get the pad level.

After the corner forms were set, some changes were made.

The steel rebars and foundation lumber being delivered.

Getting the pad to the correct height was a challenge.

Discussing the layout of the piers.

The flags are placed and the ground is ready to be drilled.

Sebastian and his helper study the plans to determine the dimensions of the steel for the piles.

The re-bar is cut to length using a gas powered saw.

Several lengths of re-bar are cut at the same time.

A worker begins the assembly of a pier.

Sebastian uses a special tool to quickly wrap each section of the hoop part of the pier assembly.

 
 