Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Foundation Framing and Cement Pour - Day 1 - Studio Floor

December 8, 2010 - Yesterday afternoon was beautiful and the foundation crew set the forms for the green screen room. They completed their work on leveling the ground, and put the yellow plastic vapor barrier in place.  Next, they shook out the re bar, and tied it together.  They set the re bar on plastic "chairs"  to keep it centered. Overnight it rained and the weather turned cold.  The earky morning skys were overcast and it looked like it could start raining any minute.

Everything was ready for the arrival of the first concrete truck (scheduled in at 9:00am). The photos to the right illustrate the pouring and the step-by-step process of finishing the foundation floor.

The pour went well, and we turned our attention to the second part of the foundation - the areas under the containers.  Before we could pour these foundation sections, we would have to set all the plumbing lines for the building.  I called several plumbers and did not have much luck getting them to come out to the site, or if they did come out, follow up with a written bid.  Luckily, Truman and David Cox had requested bids from two plumbing contractors they worked with in the past. 

I met with David Yeberra of Triton Plumbing of Magnolia. He came out to the site and we spent a couple of hours talking over the work we needed for the next day.  David said (more than once) ..."this is not a typical building" and he was willing to spend the extra time needed to get the job done right.  I asked him to break his bid out into "Ground Work" and "Finish Work", since we only needed ground work at this time.  We negotiated a price for the job, and he agreed to return the next day to put the lines in.  In the next blog entry we will tell you how things went with the plumbing and the completion of the slab.




Posted by on December 10, 2010


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


Donald Ethredge Very interesting project, Can't wait to see the finished project. Ran across information in the December Issue of Metal Architecture, I would like some day to do same idea for our embroidery and screen printing business, That is located in NW Houston. Donald
 
2010 12 13


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



The yellow vapor barrier was placed on the tamped down earth, and the re bar positioned in place.

View of the green screen foundation floor looking Northeast.

The first of two concrete trucks arrive and gets into position.

The cement begins to flow - I hope all the forms, piles and piers are in the right place!

Mr. Brooks uses a screen to remove any air bubbles in the concrete.

The foundation is poured and the guys warm up by the fire.

After a few hours, the floor is hard enough to walk on.

Sebastian uses the power trowel to get the floor surface smooth.

Workers use hand trowels to get the floor perfect for a video camera dolly to roll on.

 
 