Epic Software index login search
spacer
 
Blog Archive
2016
June (1 )
2013
December (1 )
August (2 )
July (1 )
March (1 )
February (3 )
2012
December (1 )
November (1 )
August (2 )
July (1 )
June (3 )
May (1 )
April (2 )
March (3 )
February (2 )
January (6 )
2011
December (4 )
November (4 )
October (6 )
September (6 )
August (6 )
July (4 )
June (4 )
May (7 )
April (6 )
March (4 )
February (4 )
January (5 )
2010
December (6 )
November (3 )
October (3 )
September (1 )
August (3 )


By Bloger
Vic (30 )
Anthony (2 )
Andrew (3 )
Adam (2 )

Back to the Blog

Our Blog

RSS Feed for this Blog

   
title_blog.jpg

Fire Marshal Inspects Building - Carpet Installed - Trim Work Continues

July 30, 2010 - This week we had the Fire Marshal come to the job site for his inspection - and all went well. He toured the building and we had five minor things we needed to correct. They included automatic door closers on all exit doors, weatherstripping around the large studio door, mounting the address signs on the building, installing some missing outlet covers, and adding some signs to the exit doors. We got all of the items corrected, and next week we should have our Certificate of Occupancy. With that, our anchor tenant, Silver Rock Productions, can move in. The timing was perfect since this week we got the carpet installed, the trim work done, and the interior of their space cleaned and ready to go.

We have one major inspection left, and that is for our ADA (American Disability Act) requirements. These code requirements are very specific and are also expensive to comply with.  For example, all handrails need to include grab rails and must be terminated in a very specific way. The interior stairs require that we install kick plates and side guards. The wire rope cables on the ramp must be spaced no more than 4" apart - we can go on for a full page on the many requirements which have added additional cost to the building with little or no benefits.

Next week we will finish working on the metal wall we are installing around the ramp. The steel for this wall comes from the steel we cut from the common interior walls of the container back in January. Enclosing the ramp will result in a great storage area for the tenants of the building with very small construction costs. On Monday we will order the additional steel needed for the stairs in the rear of the building, and the interior handrails of the ramp.




Posted by on August 01, 2011


Send this article to your friends
Facebook Email Digg Designfloat del.icio.us Ask Google Twitter Amazon Wishlist Nujij BuddyMarks Squidoo MySpace Multiply LinkedIn oneview Bebo

Post A link on your blog or webpage!

Post URL on your blog or webpage!

E-Mail As A link Mailto
Add to your Favorites
More Shareing Options

Comments


No Comments made yet


Leave a comment

Name:
Email:
Your Comment
Notify me of follow-up comments?
 



Work begins on building the wall around the ramp.

Close up work showing Cliff and Alan fabricating the steel wall.

Hardware was installed for the the wire rope on the ramp and walk.

Eye rings are weleded to the container walls for the ends of the wire rope.

Close up showing the terminations of the wire rope cables.

To meet ADA requirments, kick plates and side shields were installed on the steps.

The rails also required special terminations for ADA purposes.

Address signs were installed over the entry for each door.

Automatic door closers were installed on each exit door.

The large doors to the studio were trimmed out with Aluminum Composite Panels and weather stripping

125 yards of carpet were installed in just under 5 hours.

After the carpet was installed, metal trim was added for the threshold. Later, wood baseboard trim was added.

Several loads of dirt were delivered which will be used for landscaping purposes.

 
 